Shell, Shearwater Platform

Shell, Shearwater Platform Replacement of an old bespoke granite top counter with a new counter, creating improved flow in a small, but very busy dining area These images show: The new L shape bespoke counter unit, with refrigerated storage space, using the whole of the back wall and corner section. Refrigerated salad well, drop in…

Clipper PH

Clipper PH IDL were commissioned to design the galley, mess hall and laundry areas in 2010 for the new Clipper accommodation platform to be installed via a bridge link to the existing Sole Pit Clipper Complex. In 2014 we received the order from Rosetti Marino in Italy to supply and install the Galley, mess hall…

Noble Houston Colbert

Noble Houston Colbert In May 2019 IDL travelled to Qatar to survey the galley on board the Noble Houston Colbert rig. After our survey we drafted up designs and produced 3D renders for our clients approval. Over the following months the rig travelled from Qatar to the Nigg Yard in Scotland for the refurbishment to…

St Thomas Leesfield

St Thomas Leesfield We were asked by Oldham education department to look at St Thomas Leesfield Primary school with a view to designing a brand new kitchen area as the existing kitchen was very small. The school had secured a modest grant to relocate the kitchen adjacent to the dining hall and together we planned…

Shawclough County Primary

Shawclough County Primary School IDL were recently awarded the contract to replace the old wet well hot servery counter at Shawclough Community Primary School in Rochdale. With the clients input we designed a new counter that incorporated a dual flow system with the counter built as a mirror image, meaning the children could be served…

Riverside College, Widnes

Riverside College, Widnes IDL were appointed directly by the college to design, supply and install a new teaching kitchen. As the main contractor on this project, we were also responsible for disconnecting and removing the existing catering equipment, builders’ works, flooring, ceilings, plumbing and electrical works. The project commenced early 2019 from initial design through…

Thurcroft Infants School

Thurcroft Infants School In June 2019 IDL were appointed by TH Michaels Construction Ltd to work with them on a school kitchen refurbishment project. The refurbishment included an upgrade to the kitchens ventilation system, a service chamber, the installation/commissioning of re-used catering equipment and a new gas range. The ventilation upgrade included a new bespoke…

Parish Hall

Parish Hall Late December 2019, IDL were awarded the contract to install a commercial kitchen at a local parish hall. Acting as the main contractor our scope of works included the strip out (and removal) of the existing domestic kitchen, flooring, ceiling and wall tiles. To allow the new kitchen to be installed our experienced…